Phase Five: Implementation

Engineered
Construction.

The work below the finished surface matters. Site conditions, drainage, materials, and the agreed project scope all inform a construction plan.

Landscape Construction Barrie Ontario

Construction Planning

Project-Specific Scope

The Golden Maple
Standard of Build.

Base Preparation

Final excavation and base details are determined from the site and written project scope.

Deck Framing

Deck framing requirements are reviewed for the selected design and applicable approvals.

Jointing and Edging

Material selections and installation details are discussed for the specific project.

Site Care

Site protection and closeout expectations are confirmed in the project-specific scope.

Ground Protection

Access and protection measures are planned around the property and equipment needs.

Project Updates

Communication expectations and milestones are discussed before work begins.

Built to Outlast.

The crew builds the written scope: excavation and base for that soil, drainage away from the house, the materials you approved, and a walkthrough when the surface is finished.

Phase Six: Handover Details

Build a legacy
in your backyard.