Who supplies what on a porcelain project?

2026-11-23 3 minLast updated:

A supplier says the porcelain is coming on Thursday. The driver is expecting someone to receive it. The landscape crew has kept the driveway clear, but nobody there has the order number. All three people can be doing exactly what they were asked to do and still have a delivery problem.

For a builder or designer coordinating porcelain installation, put the supply handoff on one sheet before the enquiry goes out. Give each task a name and a person. If the person has yet to be agreed, leave the field open for discussion.

Name the buyer and the person who approves changes

Start with the porcelain itself. Show the selected product, finish and size. Identify who sends the order, who approves it and whose name the supplier has on the account. If the client has already paid a deposit, record the order reference and have the buyer confirm what can still change.

Take the same approach to related materials. The finish schedule might name a coping or trim piece while the installer assumes the builder is supplying it. Ask who purchases each agreed item, how it's identified and when the person responsible needs a final decision. Leave space for the system to be confirmed before anyone commits to related products.

Decide who can approve a substitution. If the selected item becomes unavailable, someone has to handle the call from the supplier and bring the proposed change to the people responsible for the design and installation. A useful brief gives that person a name before the call comes in.

Write the delivery as several separate tasks

“Delivered to site” can cover several versions of the same morning. Ask the supplier what the delivery includes. Show where the truck is expected to stop, what the driver is providing and who will move the product from the drop location to storage. Identify who's meeting the driver and who has the purchase order and packing information.

In a shared driveway or active construction site, identify the space for the order and when it can be used. A spot marked on last week's plan may already be spoken for by another trade. Whoever coordinates the site should be able to confirm the landing and storage area and tell the recipient what to do if it isn't available.

For a quick responsibility check, ask for a name beside each item.

  • Purchase and order changes.
  • Delivery booking and notice to the site.
  • Receiving, count and delivery paperwork.
  • Unloading, storage and movement into the work area.
  • Damage reporting, replacements and decisions on leftovers.

Close the loop on damage and remaining material

Check the seller's receipt and claims process before the truck arrives. Give the person receiving the order the contact details, any evidence requirements and the reporting deadline that applies. Decide who sends the claim, who tracks the replacement and who tells the project lead if something expected for installation is missing.

After work, separate the pieces the client wants to keep from items someone has agreed to collect or return. Decide where labelled spares should go and whether a return has to be arranged by the buyer. Keep those responsibilities in the same record as the original order. They can get lost when the job closes and the people who received the material move to the next site.

When requesting a proposal, send the sheet alongside the current drawing and product information. Ask the installer to confirm which tasks belong in their price and which depend on the builder, client or supplier. Update the sheet when the proposal is agreed so the person opening the gate on delivery day can use it.

Discuss a trade installation.